Skip to main content
Back

Technion's Group-Cutset Solver Cuts Robot Inspection Planning Gaps by 50%

New flow-based MILP formulation and Branch-and-Cut solver cut optimality gaps by 30-50% and scale inspection planning to 15,000-vertex roadmaps.

Pro

  • New MILP formulations for graph inspection planning based on network flow, with a Branch-and-Cut solver.
  • The Group-Cutset formulation lazily generates root-to-group cut constraints via max-flow separation oracles.
  • Reduces optimality gaps by 30 to 50 percent on large instances versus prior state of the art.
  • Scales to 15,000 vertices and thousands of POIs where prior methods exhaust memory or fail.
  • Evaluated on CRISP medical inspection, drone bridge inspection, and synthetic maze scenarios.
  • Code available at GraphInspectionPlanning, Python plus Gurobi.

Getting a robot to inspect every corner of a jet engine, a bridge, or the inside of a human lung sounds like a routing problem, but it is significantly nastier. The robot has to visit configurations where its sensors can see specific points of interest (POIs), and it has to do this along a connected, short path. A new paper from researchers at the Technion tackles this at scales that previously broke every solver, using a reformulation that treats coverage and connectivity as a network flow problem.

Why inspection planning is a beast

The problem is called graph inspection planning (GIP): given a roadmap of robot configurations (vertices) and feasible motions (edges), find the cheapest tour from a start vertex that inspects every POI. GIP generalizes both set cover and the traveling salesman problem, both of which are NP-hard and even hard to approximate within constant factors. You are simultaneously picking which vertices to visit (to cover all POIs) and stitching them into a minimum-length tour.

Previous state-of-the-art work by Mizutani et al. used a Mixed Integer Linear Programming (MILP) formulation solved with Branch-and-Bound. It worked on modest problems but performance degrades as the graph and the number of POIs grow, leading to loose lower bounds and limited near-optimality certification even at small scales. Real motion-planning roadmaps have thousands to tens of thousands of vertices, so this ceiling matters.